I spent the first 2-3 months in NY with
a very painful and bad case of the shingles--
so not alot got done--
Sept--
just a bit of counted cross stitching got done--
the severe pain in my whole right side of my torso
started mid month--
October was a blear--really-
little bit more done on the cross stitch--
2 applique hearts somehow got stitched--
and started a pair of socks--
these have hardly been worked on since--
November-
Fall did get finished--
found I could cross stitch for awhile after I ate breakfast--
but knitting really made my side flare up--
as did typing on the computer--
Dec-
finally some better-
though I think I had food poisoning really bad for 5 days after
Anne and I ate at Curlys on a Tues--
I did alot of sorting of my fabrics mid Nov and sent 3 totes full
with Denise to her shows--she made me a $100 but have lots left yet???
Then I sorted sewing notions ect-
and packaged up 2 medium boxes full--
and sent them to Lynn in CA to hand out to quilters who lost everything in
the fires out there--
Made 18 Polar bear Chmas ornaments and sent them to blog friends and others--
started knitting these little stockings--
(have 12 done--in different colors for next year so far)
this was my 'tree' this year--
and in the gifts plus some from Anne and Melinda--
from Carol in NY
from Alice, Sunny, Melinda and Anne--
And my big big accomplishment in 2018--
In Dec I got this one done--
the summer one--
and that means that I got all 5 samplers finished--
So I did get some quilts quilted this past year--
lots of counted cross stitching done-
and bom blocks done--
Today the last day of the year--2018--it is cold breezy and over cast--(30 degrees)
Monday, December 31, 2018
Friday, December 28, 2018
AUGUST
This months color was orange--
a few more hearts got done-
and some cross stitching--
the summer abc got all the letters stitched in it--
but then decided to go back and do the designs on the fall one--
in hopes that it would be done in time to display this year--
also in July and August I had 2 PT guys coming in 2 times a week for work outs--
Danny came and we did lower body--
and Mac came and we upper body--
and I packed and packed--
we shipped 22 boxes this time--and shipped them UPS from Staples--
still had a lot of broken items even with all the bubble wrap and quilts --
I flew back into Elmira on Aug 29th and knew the minute I stepped foot on the tarmac--
I wanted to go right back to Fl--Anne (and Fred) picked me up at the airport--
and then I started a huge adventure------
a few more hearts got done-
and some cross stitching--
the summer abc got all the letters stitched in it--
but then decided to go back and do the designs on the fall one--
in hopes that it would be done in time to display this year--
and a couple more sweaters--
Danny came and we did lower body--
and Mac came and we upper body--
and I packed and packed--
we shipped 22 boxes this time--and shipped them UPS from Staples--
still had a lot of broken items even with all the bubble wrap and quilts --
I flew back into Elmira on Aug 29th and knew the minute I stepped foot on the tarmac--
I wanted to go right back to Fl--Anne (and Fred) picked me up at the airport--
and then I started a huge adventure------
JULY
this months color was red--
and I decided to finish the applique on my dress's quilt that i am designing-
needed to finish 4 dresses-

and I got them all done--
another joy/alice block--
a third set of heart blocks got started--at end of the month--
and I decided to finish the applique on my dress's quilt that i am designing-
needed to finish 4 dresses-
and I got them all done--
another joy/alice block--
a third set of heart blocks got started--at end of the month--
and I started putting the first set of blocks together--this is my set--
and the summer ABC got started--
and even more sweaters got finished--
I had also gotten a call from NY about an apt back at the Jefferson-
the kids think I should move back so did say 'yes'--???
JUNE
Finished the spring sampler--
got more hearts done--
I kept the applique heart thing for another month--
this time blue was the color and these are a gift for Anne--
worked an appliqueing these hexies down--
two more emboridery blocks by Joy/Alice got stitched--
and more baby sweaters--
and some hats--
got more hearts done--
I kept the applique heart thing for another month--
this time blue was the color and these are a gift for Anne--
worked an appliqueing these hexies down--
two more emboridery blocks by Joy/Alice got stitched--
and more baby sweaters--
and some hats--
MAY
Now things get a bit out of hand this month--
first is my birthday--
and then a couple days later--
the lady across the hall from me--
tried to burn the building down--
my apt took some water damage from the sprinklers--
so spend 5 days at Dawns-
this months color was pinks--
and for the kites--I did 3
then there were Mermaids to stitch--from Joy-
and here is where I left off with the next sampler-
and this quilt did get quilted--
and my heart a day --hearts
and another sweater--
or two--
my birthday gifts--
From Alice--
way too many goodies--
from Sunny-
and from Carol-
first is my birthday--
and then a couple days later--
the lady across the hall from me--
tried to burn the building down--
my apt took some water damage from the sprinklers--
so spend 5 days at Dawns-
this months color was pinks--
and for the kites--I did 3
then there were Mermaids to stitch--from Joy-
and here is where I left off with the next sampler-
and this quilt did get quilted--
and my heart a day --hearts
and another sweater--
or two--
my birthday gifts--
From Alice--
way too many goodies--
from Sunny-
and from Carol-
Subscribe to:
Posts (Atom)